# msprojects.org.za: Palo census record

Palo, a census of the South African web by Dirišwago. Record: https://palo.dirishwago.co.za/explore/msprojects.org.za.md
As of the analysis on 23 November 2026, 04:14 SAST. Data licence: CC BY 4.0; credit "Palo, Dirišwago (palo.dirishwago.co.za)".

Where it is: .za › org.za › msprojects.org.za

## The domain

msprojects.org.za is a domain registered under org.za. Status: active, the status of its one site. Its own name is a site in the census, recorded below.

- Sites: 1
- Domains linking to it: 1
- Domains it links to: 1
- PageRank rank: 77,955 of 258,380 domains in the graph of links between domains
- Connected group: none; no domain it reaches by following links leads back to it

### Linked from 1 domain

Links counts the links between the two domains' sites in that direction, seen in the 60 days before the latest analysis.

| Domain | Zone | Status | Links |
|---|---|---|---|
| [nexusliving.co.za](https://palo.dirishwago.co.za/explore/nexusliving.co.za.md) | co.za | active | 1 |

### Links to 1 domain

Links counts the links between the two domains' sites in that direction, seen in the 60 days before the latest analysis.

| Domain | Zone | Status | Links |
|---|---|---|---|
| [jfbventures.co.za](https://palo.dirishwago.co.za/explore/jfbventures.co.za.md) | co.za | active | 1 |

## The site at msprojects.org.za

### Summary

msprojects.org.za is in the census. Status: active when Palo last checked it, on 23 November 2026 (the homepage answered with a page, directly or after redirects). 1 site in the census link to it, and it links to 1 site.

Website: https://msprojects.org.za/

### Recorded about the site

Text in quotation marks is what the site declares about itself, quoted as data.

- Title: "Home - Marius Smit Projects"
- Description: "Marius Smit Projects - Construction Starts Here"
- Language: en
- Open Graph metadata: yes
- Homepage size: 107 KB, 76 links
- First seen: 8 November 2026, found through a link from a crawled .za site
- Listed by: a link from a crawled .za site

### Position in the link graph

The graph holds the active and blocked sites in the census and the links between them: 321,157 sites. Rank 1 is the highest.

- Links in (in-degree): 1 site in the graph link to it
- Links out (out-degree): it links to 1 site in the graph
- PageRank rank: 125,418 of 321,157
- PageRank rank without footer-only links: 96,987 of 321,157
- PageRank rank between registered names: 81,829 of 321,157
- Betweenness rank: 75,774 of 321,157
- Sites reachable by following links: about 3 (estimated)
- Community: one of 6,502 sites in its Louvain community

Definitions: in-degree and out-degree count links from and to other sites in the graph. PageRank weighs links by the rank of the sites they come from; every link counts the same, whatever its purpose. Without footer-only links, it leaves out links only ever seen in a page footer. Between registered names, it leaves out links between sites under one registered name, such as x.co.za and shop.x.co.za. Betweenness measures how often a site lies on the shortest paths between others. An island has no links to or from other sites in the graph; an unrecognised site links out but has no links in. A Louvain community is a group of sites more densely linked to each other than to the rest.

Every link of the site, with where on its pages it was seen: links in (1) https://palo.dirishwago.co.za/explore/msprojects.org.za/links-in.md, links out (1) https://palo.dirishwago.co.za/explore/msprojects.org.za/links-out.md

### Links leaving .za: 1 domain

Domains outside .za that its crawled pages link to:

- policies.google.com (body)

## Related

- Other sites in its zone (org.za): https://palo.dirishwago.co.za/census/sites.md?zone=org.za
- Search the census: https://palo.dirishwago.co.za/census/search.md?q={words}

## About these figures

- A domain is a name registered under a .za zone, such as uct.ac.za, with the sites under it, such as lib.uct.ac.za. Its status is the best of its sites': active, then unavailable, then blocked, then dead.
- Only links between .za sites in the census are counted; links from outside .za, social media and search engines are not observed.
- Links added by scripts after a page loads may be missed, and pages Palo has not crawled are not seen.
- Census-wide figures, definitions and limitations: https://palo.dirishwago.co.za/api/summary
- What the census holds and how to use it: https://palo.dirishwago.co.za/llms.txt
- This record for people: https://palo.dirishwago.co.za/explore/msprojects.org.za
